nav emailalert searchbtn searchbox tablepage yinyongbenwen piczone journalimg journalInfo journalinfonormal searchdiv searchzone qikanlogo popupnotification paper paperNew
2026, 01, v.41 12-19
铁路建设项目材料价差调整的探讨
基金项目(Foundation):
邮箱(Email):
DOI: 10.20262/j.cnki.issn.2097-6186.2026.01.03
摘要:

本文根据现行铁路建设项目实施阶段材料价差调整的指导意见,运用基础数学工具,结合工程实践经验,围绕原理、方法、范围、比例、数量、单价和精度等七个方面,对材料价差调整工作进行了全面的探讨,拟为现行材料价差调整指导意见的修订提供参考,为材料价差调整工作的精细化、数字化、信息化、市场化发展方向提供助力。

Abstract:

Based on the current guiding opinions on the adjustment of material price differences during the implementation phase of railway construction projects, this paper uses basic mathematical tools and combines engineering practice experience to conduct a comprehensive discussion on the material price difference adjustment work focusing on seven aspects, namely principle, method, scope, proportion, quantity, unit price and accuracy. The paper intends to provide references for the revision of the current guiding opinions on material price difference adjustment and contribute to the development direction of refinement, digitalization, informatization and marketization of material price difference adjustment work.

参考文献

[1] 李闻.铁路建设项目实施阶段材料价差调整方法探讨[J].铁路工程技术与经济,2024,39(6):5-10+31.LI Wen.Discussion on Material Price Difference Adjustment Methods in the Implementation Phase of Railway Construction Projects[J].Railway Engineering Technology and Economy,2024,39(6):5-10+31.

[2] 杨国庆.现行铁路工程材料价差调整方法探讨[J].铁路工程造价管理,2010,25(3):18-19+23.YANG Guoqing.Discussion on Current Material Price Difference Adjustment Methods for Railway Engineering[J].Railway Engineering Cost Management,2010,25(3):18-19+23.

[3] 姚亚礁,王利宁,李芳.水电工程建筑材料价差调整研究[J].建筑经济,2024,45(9):62-68.YAO Yajiao,WANG Lining,LI Fang.Research on Adjusting the Price Difference of Building Materials in Hydropower Engineering[J].Construction Economy,2024,45(9):62-68.

[4] 陈光.铁路项目材料价差调整中的难点分析[J].中国商界,2023,(12):54-55.

[5] 余家升.铁路建设项目实施阶段材料价差调整有关问题的探讨[J].财富时代,2025(1):70-72.

[6] 邹德剑.地方铁路项目施工企业自购材料价差调整研究[J].工程建设与设计,2024(19):247-250.

[7] 符金娥.铁路建设项目实施阶段材料价差调整有关问题的探讨[J].铁路工程技术与经济,2022,37(3):67-70.Fu Jine.Discussion on Issues Related to Material Price Difference Adjustment in the Implementation Phase of Railway Construction Projects[J].Railway Engineering Technology and Economy,2022,37(3):67-70.

[8] 储永浩.关于铁路建设项目材料调差问题的思考[J].铁路采购与物流,2012,7(10):58-59.

[9] 张璐瑶.王宏辉.建筑工程材料价格市场化程度分析与研究[J].工程造价管理,2024,35(1):9-16.

[10] 林德成.工程项目材料价格调整的原则与策略[J].建筑经济,2025,46(3):69-73.LIN Decheng.Principles and Strategies of Material Price Adjustment for Engineering Projects[J].Construction Economy,2025,46(3):69-73.

[11] 姜春亮.铁路建设项目材料价差调整小数点后位数取定的探讨[J].铁路工程技术与经济,2023,38(1):16-21+33.Jiang Chunliang.Discussion on the Determination of Decimal Places for Material Price Difference Adjustment in Railway Construction Projects[J].Railway Engineering Technology and Economy,2023,38(1):16-21+33.

[12] 原铁道部.关于铁路建设项目实施阶段材料价差调整的指导意见:铁建设[2009]46号 [S].北京,原铁道部,2009.

[13] 原铁道部.铁道部关于补充铁路建设项目实施阶段材料价差调整目录的通知:铁建设[2012]230号 [S].北京,原铁道部,2012.

[14] 国家铁路局.铁路基本建设工程设计概(预)算编制办法:TB 10801—2024 [S].北京:中国铁道出版社,2024.

[15] 国家铁路局.铁路基本建设工程设计概(预)算费用定额:TB 10811—2024[S].北京:中国铁道出版社,2024.

基本信息:

DOI:10.20262/j.cnki.issn.2097-6186.2026.01.03

中图分类号:U215.1

引用信息:

[1]姜春亮.铁路建设项目材料价差调整的探讨[J].铁路工程技术与经济,2026,41(01):12-19.DOI:10.20262/j.cnki.issn.2097-6186.2026.01.03.

发布时间:

2026-01-25

出版时间:

2026-01-25

引用

GB/T 7714-2015 格式引文
MLA格式引文
APA格式引文